A Beginners Guide On Pipeline Stringing

By Angela Hughes


Natural gas drilling project is a good investment you can count on. The pipelines that are used to transmit natural gas have a steel mill construction. There are very many aspects to consider when it comes to pipeline stringing and the construction includes very many processes. The project may also take a while. If you are thinking about it, below are a number of steps you should know about.

Stringing is a crucial part of the construction. It requires your utmost attention as every part is dissimilar. In addition, if they are not stored well, you will need a lot of time to complete it. Every pipe should be marked well so as to know where it should be exactly placed on the line. The coating and thickness utilized are determined by the location and the soil condition.

Every equipment to be used in offloading and transportation of parts must be specified. For the trailers, they need not carry ten segments and above at any given time. The trailers must have suspensions to ensure that traveling is not dangerous. Because of this, a majority of the corporations doing installation have adopted new techniques that can carefully remove all the pipelines from trucks.

Bending will also have to be done. For this task, large devices are normally used in taking parts and bending them. The devices will easily curve the parts if they are required and will also fall and rise with a given elevation. They also feature a bending die or set which are limited by the width of the pipe. You ought to know that using the wrong equipment or curving pipes wrongfully will delay the project.

Before starting the process, you need to get all the permits needed. It is important you write a contract and have the contractor sign it after reviewing it. All boundaries should be flagged marking where construction will be carried out. The flags are very crucial in marking the degree of construction region surrounding the right of way. The width of the right of way is normally dictated by the diameter of pipes.

In order for you to start the construction, you need to clear the staging areas. These areas are used to store fuel tanks, sandbags, stakes, silt fencing, equipment parts and to stockpile pipes. They also provide parking for employee trucks, location for office trailers and construction equipment. After they are cleared, they are covered with gravel and reinforced with wood timber.

Excavating the trench is done after the right of way has been cleared of trees. Ensure you get equipment that can help in removing stones whenever creating the trench. Sandbags should be placed within the trench so as to restrict the flow of water and to support the pipes. When the trench has been completed, pre-coated segments of pipe are transported from the stockpiles to the right of way.

Ensure that the pipeline integrity has been confirmed before the completion of the blueprint. It needs to be confirmed through hydrostatic testing. If it does not break, it indicates that it can be used. Although many pipelines are dug underground, supporting infrastructure must be constructed.